Start Early, Save More

Our Engineering, Your Design
Eden idi pre-engineered kitchens and bathrooms are custom designed to meet your individual project specifications; integrating with the structural, mechanical, and fire safety requirements of your building. Pod layout, fixtures and finishes are specified by the customer. Our pods are designed to fit within the building structure as an appliance, independent of the individual project requirements for fire ratings, and to be non-load bearing.

Engineering & Pricing
Engineered for Seamless Integration
The only noticeable difference between a factory built pod and a site built kitchen and bathroom will be the improved quality and consistency of those built in Eden idi’s controlled manufacturing facilities. Although the sequencing of installation and mechanical hook-up may change, the end product will be identical.

Materials for Long-Term Quality
Eden idi utilizes the best materials in quality and durability so that not only does the kitchen/bathroom look good, but will reduce long term service and repair needs.

Fixed Price
A fixed price contract is used to define pricing and terms, as well as outline roles and responsibilities of both parties. Eden idi’s goal is to ensure good communication so your project goes exactly as planned. Once the contract is executed, production time is locked and procurement begins.

Customer Approval of The First Unit
In order to ensure that communication between Eden idi and the customer is exact, Eden idi builds one reference unit that the customer personally inspects and approves prior to full scale production. Eden idi guarantees that each subsequent unit meets the same precise specifications the customer approved on the first unit.

Production, Inspection and Test
Eden idi uses the latest manufacturing technologies, including lean manufacturing and automated production resulting in extreme precision and improved fit and finish. Our staff negotiate the best possible pricing direct from large manufacturers, eliminating expensive middlemen.

Quality is controlled by refined production processes with testing and inspection during each step. This includes electrical tests and pressure testing of plumbing lines. All bathrooms are shipped with a marine grade shrink wrap covering to prevent any moisture damage while on the construction site. This protective layer does not need to be removed for craning and protects the unit until the building is weather tight.

Deliver to Schedule
We understand the importance of on-time construction schedules, and we realize that the pods must be available when required. The schedule is based on the actual construction sequence.

Installation and Hook-Ups
A lifting frame will be provided on site for craning the pods into place. This lifting equipment will be certified by a qualified structural engineer.

Pods are lifted by crane and set into the building. Depending on the construction type and riser design, the pods are either set in their final position or are left adjacent to this position and slid into place at the appropriate time.

Plumbing and electric hook-ups are greatly simplified because we design our terminations specific to each job. We provide a coiled electrical line that can be installed into a local junction box. Plumbing hook-up consists of hot/cold lines which we terminate in a convenient location and waste lines that are easily hooked into the stacks.

Final Inspection
Eden idi guarantees that each kitchen and bathroom meets the standard set by the reference unit, which was initially approved by the customer. Eden idi engineers inspect the kitchens and bathrooms at the site with the customer to ensure that all expectations have been met.

 

 

 

 

Request a Catalog

Catalog Request

__________________________

Industry News

Atlantis, the palm bridges the two towers
As the Royal Towers begin to take shape the interiors are positioned with the prefabricated bathroom pods installed into the rooms and suites upto the 10th ...

Download the article (PDF)

 

_______________________

Case Study

Traditional construction techniques could not be used
to provide a 28 bed, 3-storey extension for Dublin's
busiest hotel complex - The Shelbourne Hotel...

Download the article (PDF)

 

_______________________

Case Study

Beaufort Court is a high-density urban development consisting of
65 dwellings over 6 storeys, ranging in size and format to form three blocks around a communal area...

Download the article (PDF)

_______________________

©2007 Eden idi. All Rights Reserved