Eden idi kitchen and bathroom pods are delivered to the project site as you need them. Fully secured and weatherproofed, installation of the pods takes under 1 hour per pod from the time the truck pulls up to the project site.
________________________________________________________________________
Once our pods have
been delivered to the site,
they are placed inside the
building using a crossbeam
and a crane specially provided
on the site. They can be
positioned: |
Directly from above,
through the open ceiling
or
Through an opening
in the facade using the
Eden idi cage or landing platform |
|
|
|
|
Request a Catalog
__________________________ |
Industry News
Atlantis, the palm bridges the two towers
As the Royal Towers begin to take shape the interiors are positioned with the prefabricated bathroom pods installed into the rooms and suites upto the 10th ...
Download the article (PDF)
_______________________ |
Case Study
Traditional construction techniques could not be used
to provide a 28 bed, 3-storey extension for Dublin's
busiest hotel complex - The Shelbourne Hotel...
Download the article (PDF)
_______________________ |
Case Study
Beaufort Court is a high-density urban development consisting of
65 dwellings over 6 storeys, ranging in size and format to form three blocks around a communal area...
Download the article (PDF)
_______________________ |
|